As part of our commitment to maintaining a secure and up-to-date platform, IXFI will actively support the upcoming network upgrades for both MANTRA (OM) and MultiversX (EGLD).
We will be handling all technical aspects of these upgrades behind the scenes. To protect your assets during this process, we will temporarily pause deposits and withdrawals for each network at the times specified below.
MANTRA (OM) upgrade: Deposits and withdrawals for OM will be paused starting October 27, 2025, at approximately 08:21 UTC. The network upgrade is scheduled for block height 9,664,888.
MultiversX (EGLD) upgrade: Deposits and withdrawals for EGLD will be paused starting October 30, 2025, at approximately 16:30 UTC. The network upgrade is scheduled to take place at approximately 17:30 UTC on October 30, 2025.
Your ability to trade both OM and EGLD will not be affected during their respective upgrades.
Deposit and withdrawal functions for each network will be restored as soon as we are confident the upgraded networks are stable and secure.
 
													