IXFI will actively support the upcoming network upgrades for both Injective (INJ) and Moonriver (MOVR).
We will be handling all technical aspects of these upgrades behind the scenes. To protect your assets during this process, we will temporarily pause deposits and withdrawals for each network at the times specified below.
Injective (INJ) upgrade & hard fork
- Deposits and withdrawals for INJ will be paused starting September 25, 2025, at approximately 13:30 UTC.
- The network upgrade and hard fork are scheduled for block height 134,805,000, estimated to be around 14:30 UTC on September 25, 2025.
Moonriver (MOVR) upgrade
- Deposits and withdrawals for MOVR will be paused starting October 6, 2025, at approximately 12:30 UTC.
- The network upgrade is scheduled for block height 13,454,661, estimated to be around 13:30 UTC on October 6, 2025.
Deposit and withdrawal functions for each network will be restored as soon as we are confident the upgraded networks are stable and secure.